Bridge clearances & height specifications

Our overview tables provide you with up-to-date information on bridge clearance heights and target depths within the port area. The values are regularly updated to ensure you always have accurate data.

BridgeLowest point of the superstructure or gauge zero above sea level (NN)Reference value for calculating clearance height*
a) Ruhrort gauge zero16,09 m
Bridge over the port entrance34,20 m17,80 m
Vinckekanal Bridge33,10 m17,05 m
Harbor Canal Bridge33,80 m17,40 m
Bridge over Basin C38,20 m21,80 m
b) Duisburg
Pipe bridge over the Outer Harbour37,80 m20,90 m
Road bridge over the Outer Harbour37,00 m20,90 m
c) Rheinhausen20,90 m
Energy bridge38,00 m20,75 m

Harbor bed & loading draughts

The currently valid target harbor bottoms and gauge zero points can be found in the middle column of the table below.

The loading depth should be at least 30 cm less than the respective water depth (navigable water). Taking this regulation and the differences in water levels into account, the approximate values listed in the right-hand column apply. These are based exclusively on the Ruhrort gauge. In borderline cases, the permissible loading depth must be precisely calculated based on the target bottom levels, the current water level at the Ruhrort gauge, and the safety clearance (minimum 30 cm).

The target bottom levels indicate the minimum depth, which, however, is not present across the entire water surface in areas with sloped banks.

Harbor basingauge zero above standard elevation (NHN)Loading draft (approximate value)
a) Ruhrort gauge zero16,09 mRespective water level at Ruhrort gauge
Port entrance, Vincke Canal, South Port, Ruhrort, Harbor Canal15,40 m+ 40 cm
Bunkering Port, Basin A, Basin B, Basin C15,90 m
Shipyard Port17,05 m– 120 cm
b) Duisburg
Parallel Port, Outer Port16,10 m+ 40 cm
c) Hochfeld
South Port and Kultus Port16,45 m+ 40 cm
d) Rheinhausen
Rheinhausen Port16,50 m*Download bottleneck profile Rheinhausen
e) Meiderich Canal Port, Neuenkamp Ruhr Portin accordance with the BinSchStrO, exception for turning basin = 280 cm

Clear height of overwater projecting transshipment halls

The overview below provides reference values for calculating the clearance heights of transshipment halls projecting over the water. The respective water level at the Ruhrort gauge must be subtracted from the indicated values.

Warehouses South Port, northern side at km 2.6 and 2.917,68 m
Warehouse Harbor Canal, southern side at km 2.8517,50 m
Warehouse Basin C, southern side at km 4.417,70 m
Warehouse Basin C, northern side at km 4.019,14 m
Warehouse Parallel Port, southern side at km 0.619,20 m
Warehouse Parallel Port, southern side at km 1.320,40 m
Warehouse Outer Port, northern side at km 0.418,00 m
Warehouse Outer Port, southern side at km 1.4526,10 m
Warehouse Parallel Port, northern side at km 0.517,00 m
Warehouse Parallel Port, northern side at km 0.719,60 m
Warehouse Vincke Canal turning area20,30 m

Find ideal transport connections with the Routescanner

With Routescanner, you can efficiently identify the most suitable transport routes for your shipments. This digital platform not only offers a comprehensive overview of available combined transport connections, but also displays the CO₂ footprint for each route – enabling you to plan both cost-effective and environmentally friendly logistics solutions.